Calculate the R&D tax credit: from cost to credit
The R&D tax credit is the assessment basis times the funding rate: 25%, or 35% for SMEs. For contracts placed after 27 March 2024, the 70% eligible share equals 17.5% or 24.5% of the contract fee before the additional flat rate.
- Personnel + own contributions + 70 % contract research
- From 2026: 20 % flat rate on top
- Rate 25 %, SMEs 35 %, cap EUR 12 million
From costs to the assessment base
Figures and details
Example: EUR 640,000 in personnel costs, 1,000 own-contribution hours and EUR 300,000 in contract research, SME, project from 2026. Each row shows one step of the formula above: personnel costs, own contributions, contract research, flat rate, assessment base, funding rate.
Key facts in brief
The R&D tax credit is calculated in three steps: assessment base, cap, funding rate. It sums personnel costs (Section 3(1)), own contributions (EUR 100 per hour, Section 3(3)) and 70 % of contract research (Section 3(4)). From 31 December 2025, a 20 % flat rate is added (Section 3(3b)). Cap: EUR 12 million per year, rate 25 %, for SMEs 35 %.
The essentials of the calculation
How Does This Work Out in a Concrete Case?
Two cases using amounts already used elsewhere on this page.
A 2026 project like the headline example
EUR 640,000 in personnel costs, 1,000 own-contribution hours and EUR 300,000 in contract research, SME.
Contract research without own staff
A large enterprise commissions a pure research contract worth EUR 500,000 with an external institute.
In the second case, only 70% of the contract volume counts toward the assessment base (Section 3(4) FZulG). Anyone who counts the remaining 30% by mistake overstates their credit.
Which costs count toward the assessment base?
Four cost types make up the base, each with its own rule.
| Cost type | Legal basis | Eligible | Rule |
|---|---|---|---|
| Personnel costs | Section 3(1) FZulG | 100 % | Gross wages + future provision |
| Own contributions | Section 3(3) FZulG | EUR 100 per hour | Sole proprietors only, max 40 h/week |
| Movable capital assets | Section 3(3a) FZulG | Depreciation only | Depreciation on assets used |
| Contract research | Section 3(4) FZulG | 70 % | 60 % before 27 March 2024; EU/EEA only |
How much credit results in practice?
The funding rate matters more than the cost type: 35 % vs 25 % adds a tenth more.
Small software company (SME)
Two developers plus the founder's own contribution.
12.5 h/week across 48 weeks.
Mid-sized company with contract research (SME)
Personnel, a research contract and a co-entrepreneur's own contribution.
Only 70 % of the contract counts.
Personnel, own contribution, contract research and the 20 % flat rate.
For 2020 and 2024, the value shown applies from the date noted that year.
EUR 12,000,000 × 25 % = EUR 3,000,000 for large enterprises, EUR 12,000,000 × 35 % = EUR 4,200,000 for SMEs: the maximum credit per fiscal year.
How are own contributions calculated?
Own contributions: EUR 100 per hour, capped at 40 h/week.
Weekly-hours cap reached, 2,080 hours per year
40 h/week across a full year – the maximum.
40 × 52 weeks (Section 3(3)).
Which mistakes distort the calculation most?
Five mistakes most often cost assessment base or credit.
- Contract research at 100 %: only 70 % counts (60 % before 27 March 2024) – EUR 150,000 lost on EUR 500,000.
- Own contributions forgotten: up to EUR 100/hour; 800 h/year add EUR 80,000. Not for a GmbH.
- R&D shares not separated: part-time work must be pro-rated, proven by time tracking.
- Flat rate overlooked: the 20 % applies only from 31 December 2025 – often missed or misapplied.
- SME status not verified: 25 % instead of 35 % gives up EUR 50,000 on EUR 500,000.
Which questions come up most often about the calculation?
Which Mistakes Make the Calculation Wrong?
Five mistakes change the result the most.
- Gross salary used instead of employer gross: only the wages subject to payroll tax withholding count (Section 3(1) FZulG).
- Contract research counted at 100% instead of 70%: only 70% of the invoice amount counts (Section 3(4) FZulG).
- The 20% flat rate applied to an old project: it only applies to projects started after 31 December 2025 (Section 3(3b) FZulG).
- The per-year cap overlooked: the assessment base is capped at EUR 12 million per fiscal year (Section 3(5) FZulG), not summed across years.
- Own contributions claimed for a GmbH: Section 3(3) FZulG covers only sole proprietors and co-entrepreneurs, a GmbH managing director counts only via salary.
Have your assessment base and credit calculated in a first consultation
We determine your assessment base and apply the right rate. You pay only once the allowance is approved.
Book a first consultationRead on
- R&D Tax Credit CalculatorCalculate the assessment base across several years.
- Personnel Costs & R&D Tax CreditClaiming employer gross wages correctly.
- Own ContributionsEUR 100 per hour for sole proprietors and co-entrepreneurs.
- Contract Research70 % of the fee for external R&D contracts.
- Material Costs and the R&D Tax CreditWhy materials don't count directly.
- R&D Tax Credit: Funding AmountFunding rates, caps and the maximum credit.
Max Nodes
Founder and Managing Director of NOVARIS Consulting. Specialised in the German R&D tax credit (FZulG) since 2021; 25 of 25 accompanied BSFZ applications approved (as of 09/2026). Max Nodes