R&D tax credit for automotive: from the battery to the driving function
Developing new powertrains, battery systems or vehicle functions? Germany’s research allowance can support your development work where novelty, technical risk and a systematic approach can be demonstrated. Explore eligible activities and the boundaries with routine work below.
- Funding rate up to 35%
- OEMs & suppliers eligible
- Retroactive for open years
Automotive: manage battery temperature
New approachExamine cooling channels in a battery cutaway
Open questionHow does heat move between cells?
ExperimentVary channel routing under load
In the automotive sector the scope of the project decides, not the vehicle's spec sheet.
The certification office does not assess how much software or how much battery sits in a vehicle, but whether a technical question was open beforehand and answered systematically. A supplier rarely loses an application on the technology; usually it is lost because contract development to OEM specification and own development sit in the same project.
Rates, costs and limits
The essentials on the research allowance in vehicle development
Which activities in vehicle development are eligible?
The industry does not decide eligibility. The certification office checks every project against three criteria: novelty, technical risk, systematic approach. If one fails, the application fails. Below are the activities we encounter most often at OEMs and suppliers, with the verdict we expect.
Boundary case: eligibility depends on the specific project.
22 / 22 activities shown
Drivetrain & battery
-
Novel cell cooling concept with unknown temperature spread across the cell stackEligible
Eligible. Novelty: No cooling concept available on the market holds the required temperature spread for your cell chemistry and charging power. Technical risk: Whether the spread stays below the target and no leakage occurs over the service life is not known before simulation and test module. Systematic approach: Flow simulation, test module, measurement series, iteration, documented by calculation reports and test protocols.
-
Scaling a proven battery pack design to a new cell chemistryBorderline
Borderline. Routine as long as the thermal and electrical design rules transfer. It becomes eligible when thermal balance or cell balancing demonstrably no longer follow the known rules at the new chemistry and have to be re-derived.
-
Drivetrain variant for a power class outside the previous performance mapBorderline
Borderline. Eligible is the part for which no validated performance map exists and which is resolved in testing. Not eligible is adapting known power levels within the modular kit.
-
Adapting a battery pack to a customer installation space within the known scopeNot eligible
Not eligible. Geometry, connectors, cell count: the result is known before the start, the procedure is documented. Effort is not a criterion of the FZulG.
Autonomous driving & driver assistance
-
Own sensor fusion algorithm for perception under adverse conditionsEligible
Eligible. Anyone who designs a fusion of camera, radar and lidar because standard algorithms are not robust enough in rain, glare or occlusion must explain where the available methods fail. Keep the rejected model variants and their error rates; that is the decisive evidence later.
-
Path planning or decision algorithm with open behaviour in edge casesEligible
Eligible. Whether a behaviour in an unclear traffic situation can be decided safely and traceably is open beforehand. Test drives and scenario simulations showing the behaviour over iterations are systematic approach and technical risk in one.
-
Porting an existing ADAS stack to new sensor hardwareBorderline
Borderline. Eligible if the interaction between new sensors and existing software is unresolved and worked out in testing. Routine if manufacturer interfaces and a porting guide prescribe the way.
-
Parameterisation and calibration of a purchased ADAS system to specificationNot eligible
Not eligible. Intended use of the supplier platform. Only when the platform demonstrably cannot map the requirement and a separate method is developed alongside it does an open technical question exist.
Lightweight design & materials
-
New joining process for mixed-material construction with open strength and corrosion resistanceEligible
Eligible. Whether the joint between steel, aluminium and fibre composite reaches the required crash and fatigue strength without contact corrosion shortening the service life is not settled before the test series. That makes the technical risk measurable, the strongest starting position an application can have.
-
Structural component from a new material with open crash and fatigue strengthEligible
Eligible. Whether a new material reaches the required values under crash load and cyclic stress cannot be determined before the test series. The series across wall thickness, microstructure and heat treatment is your evidence of systematic approach.
-
Optimising an existing forming process for thinner wall thicknessesBorderline
Borderline. Eligible as soon as a target wall thickness is required that the known process demonstrably fails to reach, and the cause is unclear beforehand. Without that measurement the certification office reads only a demanding requirement, and demanding is not a criterion of the FZulG.
-
Tool or material change with run-in to manufacturer specificationNot eligible
Not eligible. Even elaborate run-in remains commissioning. The way is documented, the result predictable.
Software & the connected vehicle
-
Central E/E architecture or zone controller with open real-time behaviourEligible
Eligible. Whether a new controller architecture meets the required response times and fail-safety under real load cannot be determined before simulation and prototype. Load profiles and latency measurements across several iterations are the evidence.
-
Over-the-air update platform with unclear feedback on safety-relevant functionsBorderline
Borderline. Eligible if it is documented that the interaction with safety-relevant software was unresolved beforehand and own verification methods had to be developed. Pure connection of a standard OTA solution is integration.
-
Integrating a standard infotainment system to specificationNot eligible
Not eligible. Even demanding integration work remains integration. The interfaces are specified, the way documented, the result predictable.
Testing & validation
-
Test rig trial to resolve a question that was open beforehand, with measurement plan and abort criteriaEligible
Eligible. The clearest case in this group. Whoever defines in advance what is measured and when the trial counts as failed has already documented systematic approach and technical risk before the certification office asks.
-
First commissioning of a prototype vehicle on the test trackBorderline
Borderline. Eligible is the share in which behaviour not previously mastered is worked out on the real vehicle, documented by change states and measurements. Acceptance to specification is delivery.
-
Series testing, homologation and release drives to standard procedureNot eligible
Not eligible. Necessary and often laborious work, but no gain of knowledge in the sense of the FZulG. You confirm a result that is technically settled.
What is regularly rejected
-
Contract development to OEM specification without own solution latitudeNot eligible
Not eligible. The requirement is defined, the solution prescribed by the OEM specification. The exception is a clearly separable part for which no validated design exists. Then we apply for that part, not the order.
-
Type approval, homologation and technical documentationNot eligible
Not eligible. Mandatory work under road traffic licensing regulations and UN-ECE regulations whose result is settled. The test protocols created along the way can, however, serve as evidence for an eligible development project.
-
Contract manufacturing and supply without own development riskNot eligible
Not eligible. Whoever manufactures to someone else's drawing bears no technical risk. The case is different when the supplier develops the component itself and is accountable for its behaviour.
-
Facelift and trim-level variants within the known scopeNot eligible
Not eligible. The result is fixed beforehand: the same functional scope in a new form. Occasionally submitted by advisers along with everything else, and then it drags the whole project into scrutiny.
Your project is not listed or sits between two lines? That is the normal case; eligibility is decided on the specific facts, not on the heading. Describe the project to us and we will tell you where it stands.
What evidence does the BSFZ expect in vehicle development?
Automotive companies practically never introduce an additional system for the research allowance; they have the evidence already. We evaluate what exists and assign each source to the criterion it supports.
| Source | What it proves | Criterion |
|---|---|---|
| CAD revisions · PDM/PLM | Design revisions show attempt, rejection and new approach, the strongest evidence of experimental development a development department can deliver. | Systematic approach · Technical risk |
| Test rig and climate chamber protocols | Aborted runs and measurement series from battery and drivetrain test rigs date what was tried when and what it was measured against. A failed run is no blemish; it is proof of an open outcome. | Systematic approach · Technical risk |
| FEA · CFD · multiphysics simulation | Calculation reports on thermal, flow and crash behaviour with boundary conditions and comparison against measurement show that the target value was not trivially achievable. | Technical risk |
| Change requests · ECR/ECO | Change histories name the rejected solutions, exactly the information with which the state of the art can be demonstrated. | Novelty |
| Design reviews · system architecture boards | Minutes record where a solution was uncertain and which assumption had to be tested. Rarely read, often decisive. | Technical risk |
| Homologation and release protocols | Measurements from testing document the difference between approval to standard procedure and working out previously unknown behaviour. | Scope |
| Time recording · project hours | For the tax office application the hour counts. We map an existing time recording onto the projects instead of introducing a parallel system. | Cost side |
| Standard tests · materials and battery testing | Cycle tests, crash and materials tests to UN ECE and ISO document the experimental character when they reflect iterations, not just acceptance. | Systematic approach |
The most common mistake in assisted applications is a development process constructed after the fact with phases that never existed at your company. Your real test rigs and change histories are the better evidence; they provide a complete, dated record of the procedure.
What comes out of it?
Two calculated cases for projects that started after 31 December 2025, once at the SME rate of 35%, once at the standard rate of 25%.
Tier-2 supplier, 40 employees · SME
Employer gross, 8 development engineers: EUR 680,000. Eight development engineers on a new battery cooling system, R&D share documented via project hours, plus a testing contract placed with a battery lab
Per year. Applied for retroactively over three open financial years: around EUR 0.4 million, without the overhead allowance, because the project started before 2026.
Tier-1 supplier / OEM development site, 500 employees
Employer gross, 40 developers: EUR 3,800,000. Forty developers working on ADAS software and battery systems, not an SME. Standard rate 25%, contract research with a university institute
Per year. The assessment base is capped at EUR 12 million, a maximum of EUR 3.0 million allowance at the standard rate, EUR 4.2 million as an SME.
As a rule of thumb: a development engineer with an employer gross of EUR 85,000 who spends half of the time on eligible projects yields around EUR 17,850 research allowance per year (SME rate, with the overhead allowance — the project starts after 31 December 2025). The whole is capped at an assessment base of EUR 12 million and an allowance of EUR 4.2 million per year. Go to the calculator
The eligibility rules, the sources of evidence and a template for the project description, as a PDF.
What automotive companies ask us most often
How does your documentation become an application?
Your battery lab and your test field already document everything the certification office wants to see, just in a different language. Here is the same set of facts in four registers, from the test protocol to the application sentence.
In the test field — What gets written anyway
Battery module BM-410, series 2 Spread 5 K at 3C charging // target < 3 K, distribution plate not enough - cell sensors ....... 12 pcs - channel geometry ... model v3 - series 3 ............ 2.4 K / 1,000 cycles ok
In conversation — What the team says about it
Technically complete and worthless as application text. There is no reference to the state of the art or to the measured variable.
At the BSFZ — What is actually examined
- Novelty
- Technical risk
- Systematic approach
For each of the three criteria the application must contain a verifiable statement. What is described is the knowledge gained on the way to the finished battery module.
In the application — What we formulate from it
"For direct cell cooling by a circulating dielectric medium no concept existed whose temperature spread at 3C fast charging had been demonstrated below the required target of 3 K. Whether the channel geometry and the distribution of the medium could be designed to hold this spread over 1,000 charging cycles without leakage could not be determined in advance. The project established this in three measurement series against a defined target."
Why do applications fail in vehicle development?
Rejected projects from the automotive sector rarely fail on their technology. They fail on five recurring patterns, and we see them in self-submitted applications just as in externally assisted ones.
The state of the art is missing
The application describes what was built, not why it could not be done with what was available. Without named competitor solutions, standards or standard components the certification office cannot establish novelty. This is the most common reason in our own mandates.
The OEM order is submitted as the project
Development for an OEM is not excluded per se, but an application covering "the component" forces the certification office to assess contract development and own development together. The routine shares drag the whole project down.
Project risk instead of technical risk
Delivery dates, budget and supply chain are not technical risks. Anyone arguing this way describes a management problem and gets it decided as such.
The prototype is described as a product
The application reads like a data sheet: range, charging time, latency. The certification office is looking for the way there, the trials that did not work and the measurement that proves the difference.
Cost side and facts do not match
The BSFZ certifies the project, the tax office checks the costs. Anyone who claims material costs for the prototype, or hours that contradict the project description, loses in the second step, after the certificate has already been issued.
If you already have a rejection, the first step is analysing the decision: which of the five points carries it. That determines whether objection or new application is the right way.
Which other industries use the research allowance?
The sector never decides eligibility — Section 2 FZulG does. These pages show the same three criteria against the activities of each field.
- Mechanical engineering — Design, testing, commissioning
- Medical technology — Operating principle, SaMD, pre-approval
- Pharma & life sciences — Compound, formulation, bioprocess
- Construction — Methods, materials, component tests
- Energy & cleantech — Cell, storage, grid control
- Aerospace — Structure, propulsion, avionics
- Agriculture & FoodTech — Process, formulation, field trial
- Software & IT — Algorithm, model, architecture
Send us a test protocol, not a questionnaire
In the first consultation we talk about your development, not about your legal form. After thirty minutes you know which part of your development is eligible, in what order of magnitude, and whether a retroactive application is worthwhile. The first consultation is free; 30 % of the fee falls due with the BSFZ decision, 70 % only after the allowance has been paid out.
Book a first consultationRead on
- The FZulG application in two stepsBSFZ application and tax office application: sequence, deadlines, processing time.
- Calculate the research allowanceEnter personnel costs, R&D share and contract research, read off the amount.
- Which personnel costs countEmployer gross, proportional allocation and what applies to working students and freelancers.
- Time recording for R&D hoursHow an existing time recording is mapped onto projects in a tax-office-proof way.
- Received a BSFZ rejectionRead the decision, determine the reason for rejection, decide between objection and new application.
- Approved projectsAnonymised cases from software, mechanical engineering and medical technology with amounts.
- Plant and machine building for automotive suppliersWhen your production systems are themselves the subject of development: separating plant engineering from vehicle development.
- Battery storage and charging infrastructureStationary storage, second-life batteries and grid connection as R&D projects in the energy sector.
Max Nodes
Founder and Managing Director of NOVARIS Consulting. Specialised in the German R&D tax credit (FZulG) since 2021; 25 of 25 accompanied BSFZ applications approved (as of 09/2026). Max Nodes