R&D Tax Credit 2026: the new cap and the flat rate

The assessment basis rises to EUR 12 million on 1 January 2026, plus a 20% flat rate on all eligible expenses, including the depreciation under § 3 (3a). It only applies to projects started after 31 December 2025, regardless of the fiscal year of the expenditure.

  • Assessment basis: EUR 12 million instead of EUR 10 million
  • 20% flat rate only for new projects
  • Funding rate unchanged: 25%, 35% for SMEs
At a glance

What changes in 2026

What changes in 2026 — Rules by project and cost period2026
Rules by project and cost period
Figures and details
Two values change on 1 January 2026, the funding rate stays the same
20252026Assessment basis capEUR 10 millionEUR 12 millionOverhead flat ratenone20%Maximum allowance, SME (35%)EUR 3.5 millionEUR 4.2 millionMaximum allowance, large enterprise(25%)EUR 2.5 millionEUR 3 million

The flat rate only applies to projects started after 31 December 2025. The funding rate, the contract-research share and the own-contribution rate do not change on 1 January 2026.

Key facts in brief

On 1 January 2026, the assessment basis of the R&D Tax Credit rises to EUR 12 million and a 20% flat rate is added (§ 3 (3b), (5) FZulG). The flat rate depends on when the project started, not on the fiscal year of the expenditure: a project that started in 2024 does not get it even for expenditure incurred in 2026. The funding rate stays at 25%, for SMEs 35% (§ 4 (1) FZulG). The ten percentage point SME bonus, however, only applies to activities after 27 March 2024; before that the rate was 25 % for SMEs too.

The essentials of the 2026 changes

  • Assessment basis
    EUR 12 million instead of EUR 10 million, from 1 January 2026
  • Overhead flat rate
    20%, only for projects started after 31 December 2025
  • Funding rate
    unchanged: 25%, for SMEs 35%
  • Maximum allowance
    EUR 4.2 million (SME) or EUR 3 million (large enterprise)
  • Contract research
    unchanged: 70% eligible since 28 March 2024
  • What exactly changes in 2026?

    The assessment basis cap rises to EUR 12 million, and a 20% flat rate is added. The funding rate and the contract-research share stay the same.

    R&D Tax Credit 2026: what changes and what stays
    RuleUntil 2025From 2026Legal basis
    Assessment basis capEUR 10 millionEUR 12 million§ 3 (5) FZulG
    Overhead flat ratenone20% (only for projects started after 31 December 2025)§ 3 (3b) FZulG
    Maximum allowance, SME (35%)EUR 3.5 millionEUR 4.2 million§ 4 (1), § 3 (5) FZulG
    Maximum allowance, large enterprise (25%)EUR 2.5 millionEUR 3 million§ 4 (1), § 3 (5) FZulG
    Contract-research share70%unchanged: 70%§ 3 (4) FZulG

    The maximum allowance rises along with it, because it is the cap times the funding rate: EUR 12 million x 35% for SMEs, EUR 12 million x 25% for large enterprises. Only the cap and the flat rate are new; the funding rate and the contract-research share already applied before 2026.

    What changed for the R&D Tax Credit on 1 January 2026?

    Two values change, three stay the same.

    Only the assessment basis and the flat rate are new (table in the “What changes in 2026?” section above). The funding rate, the contract-research share and the own-contribution rate already applied before 2026 and do not change with the new year.

    The 25% (35% for SMEs) funding rate did not change on 1 January 2026. Its cut-off date is 27 March 2024: since then SMEs receive ten percentage points more, and for activities before that date the rate was 25% for SMEs too.

    What does this mean for ongoing projects?

    The cut-off date is when the project started, not the fiscal year of the expenditure.

    • Project started before 1 January 2026: no flat rate, not even for expenditure in fiscal year 2026.
    • New project started on or after 1 January 2026: 20% flat rate added to the assessment basis (§ 3 (3b) FZulG).
    • The higher EUR 12 million cap applies to all projects once the expenditure falls in fiscal year 2026, regardless of when the project started.
    Companies with projects already running from 2024 or 2025 should only budget for the flat rate once a new project has officially started after 31 December 2025.