R&D tax credit for the construction industry: when the component test settles the question
Developing new building materials, construction methods or structural solutions? Germany’s research allowance can support your development work where novelty, technical risk and a systematic approach can be demonstrated. Explore eligible activities and the boundaries with routine work below.
- Funding rate up to 35%
- Component testing & materials development eligible
- Retroactive for open years
Construction: deposit material precisely
New approach3D concrete printing with circular aggregate
Open questionWhich layer keeps its form and bond?
ExperimentVary the mix and layer height
In the construction industry the open technical question decides, not the size of the building.
The certification office does not assess how complex a building was, but whether a technical question was open beforehand and answered systematically. A construction company rarely loses an application on the technology; usually it is lost because construction work to established codes of practice and development sit in the same project.
Rates, costs and limits
The essentials on the research allowance in the construction industry
Which activities in the construction industry are eligible?
The trade does not decide eligibility. The certification office checks every project against three criteria: novelty, technical risk, systematic approach. If one fails, the application fails. Below are the activities we encounter most often at construction companies and suppliers, with the verdict we expect.
Boundary case: eligibility depends on the specific project.
22 / 22 activities shown
Structural design & engineering
-
Novel structural concept with an open question on load-bearing or deformation behaviour (e.g. carbon-reinforced concrete flat slab, textile reinforcement)Eligible
Eligible. Novelty: No standardised design method covers the combination of reinforcement type, component thickness and load case; Eurocode verifications run into a gap. Technical risk: Whether deflection, crack pattern and load capacity meet the target value is not established before calculation and component testing. Systematic approach: Design model, FEA, component test, measurement series, iteration, documented by calculation reports and test protocols.
-
Topology-optimised or adaptive structure based on known materialsBorderline
Borderline. Eligible is the share for which no established design method exists, usually the numerical validation of the optimised geometry against measurement. Applying optimisation software per the manual is routine.
-
Soil-structure interaction in an unusual foundation situationBorderline
Borderline. Eligible if the interaction of ground and foundation is not fully captured by calculation and is resolved through testing or monitoring. A foundation designed to the geotechnical report and to standard is planning.
-
Structural verification to Eurocode for a conventional buildingNot eligible
Not eligible. The design method is standardised, the result predictable in advance. The effort or complexity of the calculation is not a criterion of the FZulG.
Materials development & testing
-
New concrete mix or reinforcement type with open durability or load capacity (e.g. carbon-reinforced concrete, low-carbon cement, recycled aggregate)Eligible
Eligible. Compressive strength, shrinkage behaviour and durability conflict and are measurable. That makes the technical risk quantifiable, the strongest starting position an application can have.
-
Test series for a case-by-case approval (ZiE) for a new construction product without a harmonised standardEligible
Eligible. The ZiE is the evidence route, not the goal of the project. Eligible is the test series that shows a previously unknown behaviour was systematically clarified, documented in the test certificates of the materials testing institute.
-
Optimising an existing mix for a new target value (e.g. early strength, carbon footprint)Borderline
Borderline. Eligible as soon as a measured target value is required that the known mix demonstrably fails to reach, and the cause is unclear beforehand. Simply readjusting mix ratios within the known range is mix maintenance.
-
Materials testing for conformity control under DIN EN 206Not eligible
Not eligible. Regular factory production and external control is quality assurance with a prescribed procedure and known outcome, not knowledge generation.
Construction methods & execution technology
-
3D concrete printing process with open layer bond or green-state stabilityEligible
Eligible. Whether successive layers reach the required bond strength under self-weight and time pressure is not determinable before the print series. Measurement series on layer spacing, print speed and hardening are the evidence.
-
Robot-assisted assembly with its own control for tolerance compensation on the componentEligible
Eligible. Anyone who designs a control system because standard grippers or paths do not compensate for dimensional tolerance on the real component must explain why available solutions fail. Measurement series on positioning accuracy over iterations demonstrate systematic approach and risk.
-
Automated site logistics or survey drone connected to legacy systemsBorderline
Borderline. Eligible is the share in which own evaluation methods for unclear sensor data are developed. Pure wiring and integration of finished drone software is integration.
-
Introducing a commercially available formwork system or assembly robot per manufacturer instructionsNot eligible
Not eligible. Even demanding onboarding remains applying a finished method. The way is documented, the result guaranteed by the manufacturer.
Prototype, component testing & pilot builds
-
Component test or pilot build to resolve a question open beforehand, with measurement plan and abort criteriaEligible
Eligible. The clearest case in this group. Whoever defines in advance what is measured and when the trial counts as failed has already documented systematic approach and technical risk before the certification office asks.
-
First application of a new component in a real building under service loadBorderline
Borderline. Eligible is the share in which behaviour not previously mastered is worked out on the real building, documented by monitoring and measurement series. Handover per the acceptance protocol is construction work.
-
Show home or exhibition build without systematic measurementNot eligible
Not eligible. A demonstration object without a measurement plan and evaluation is marketing, not experimental development, regardless of how novel the installed products are.
BIM & digitalisation
-
Own collision or optimisation algorithms for BIM models beyond the standard functionEligible
Eligible. Whether a self-developed method detects collisions or sequencing more reliably than the BIM software's standard check is open beforehand. Comparative measurements between method and outcome are the evidence.
-
Scan-to-BIM for existing buildings with unclear point-cloud qualityBorderline
Borderline. Eligible if it is documented that standard algorithms fail to convert the available point cloud into a usable model and own conditioning methods had to be developed. Pure surveying and modelling from catalogue components is planning.
-
BIM coordination and model maintenance in an ongoing project with Revit, ArchiCAD or AllplanNot eligible
Not eligible. Using commercial planning software as intended remains a planning service, regardless of the model's level of detail (LOD).
What is regularly rejected
-
Construction work per approved plans and established codes of practiceNot eligible
Not eligible. Building itself is the intended service of the construction trade, not its gain of knowledge. The codes of practice fix the way and the result in advance.
-
Site supervision, acceptance, defect remediationNot eligible
Not eligible. Necessary work with a fixed goal: the execution matches the plan. No gain of knowledge in the sense of the FZulG.
-
Structural verification to Eurocode without an open questionNot eligible
Not eligible. A standard verification with a normative design method, even with high calculation effort. Effort does not replace an open technical question.
-
Energy retrofit using established methods (insulation, window replacement)Not eligible
Not eligible. Implementation of known measures per the Buildings Energy Act and manufacturer specification. It becomes eligible only when a new system combination is meant to reach a target that catalogue products demonstrably cannot reach.
Your project is not listed or sits between two lines? That is the normal case; eligibility is decided on the specific facts, not on the heading. Describe the project to us and we will tell you where it stands.
What evidence does the BSFZ expect in the construction industry?
Construction companies practically never introduce an additional system for the research allowance; they have the evidence already. We evaluate what exists and assign each source to the criterion it supports.
| Source | What it proves | Criterion |
|---|---|---|
| CAD/BIM revisions · design changes | Design revisions show attempt, rejection and new approach, the strongest evidence of experimental development a design office can deliver. | Systematic approach · Technical risk |
| Component tests · test rig protocols | Aborted trials and measurement series date what was tried when and what it was measured against. A failed trial is no blemish; it is proof of an open outcome. | Systematic approach · Technical risk |
| FEA and structural reports | Calculation reports with boundary conditions, convergence studies and comparison against measurement show that the target value was not trivially achievable. | Technical risk |
| Test certificates from the materials testing institute · ZiE documentation | Test certificates and the documentation for the case-by-case approval systematically record which behaviour was tested and with what result. | Systematic approach |
| Site measurements · monitoring data | Measurements before and after the intervention document the difference between construction to plan and working out previously unknown behaviour. | Scope |
| Design changes · change logs | Change histories name the rejected solutions, exactly the information with which the state of the art can be demonstrated. | Novelty |
| Time recording · project hours | For the tax office application the hour counts. We map an existing time recording onto the projects instead of introducing a parallel system. | Cost side |
| Standard tests · materials test reports (DIN EN 206, DIN EN 1992) | Strength, durability and fire tests to DIN and EN document the experimental character when they reflect iterations, not just conformity control. | Systematic approach |
The most common mistake in assisted applications is a development process constructed after the fact with phases that never existed at your company. Your real test protocols and design changes are the better evidence; they provide a complete, dated record of the procedure.
What comes out of it?
Two calculated cases for projects that started after 31 December 2025, once at the SME rate of 35%, once at the standard rate of 25%.
Construction company with its own development department, 60 employees · SME
Employer gross, 10 structural and civil engineers: EUR 800,000. Ten structural and civil engineers, R&D share documented via project hours, plus a testing contract placed with a materials testing institute
Per year. Applied for retroactively over three open financial years: around EUR 0.4 million, without the overhead allowance, because the project started before 2026.
Precast concrete plant and engineering office, 220 employees
Employer gross, 18 developers: EUR 1,620,000. Eighteen developers working on a new connection technique for precast elements, not an SME. Standard rate 25%, contract research with a materials testing institute
Per year. The assessment base is capped at EUR 12 million, a maximum of EUR 3.0 million allowance at the standard rate, EUR 4.2 million as an SME.
As a rule of thumb: a construction engineer with an employer gross of EUR 80,000 who spends half of the time on eligible projects yields around EUR 16,800 research allowance per year (SME rate, with the overhead allowance — the project starts after 31 December 2025). The whole is capped at an assessment base of EUR 12 million and an allowance of EUR 4.2 million per year. Go to the calculator
The eligibility rules, the sources of evidence and a template for the project description, as a PDF.
What construction companies ask us most often
How does your documentation become an application?
Your component tests and design changes already document everything the certification office wants to see, just in a different language. Here is the same set of facts in four registers, from the test protocol to the application sentence.
In the test lab — What gets written anyway
Slab system D-CB120, component test 2 Deflection L/260 under sustained load // target < L/300, joint too soft - strain gauge, tie rod . 6 pcs - prestress ............ rib v2 - test 3 ............... L/340, R90 ok
In conversation — What the team says about it
Technically complete and worthless as application text. There is no reference to the state of the art or to the measured variable.
At the BSFZ — What is actually examined
- Novelty
- Technical risk
- Systematic approach
For each of the three criteria the application must contain a verifiable statement. What is described is the knowledge gained on the way to the finished slab.
In the application — What we formulate from it
"For a carbon-reinforced concrete hollow slab with novel column-to-slab joints no design concept existed whose deflection under sustained load at half the component thickness and fire resistance R90 had been demonstrated. Whether the joint stiffness could be sufficiently increased through rib geometry and prestress could not be determined in advance. The project established this in three component tests against a defined target."
Why do applications fail in the construction industry?
Rejected projects from the construction industry rarely fail on their technology. They fail on five recurring patterns, and we see them in self-submitted applications just as in externally assisted ones.
The state of the art is missing
The application describes what was built, not why it could not be done within established codes of practice. Without named standard limits, design methods or catalogue products that fail, the certification office cannot establish novelty. This is the most common reason in our own mandates.
The construction contract is submitted as the project
A building for a client is not excluded per se, but an application covering "the building" forces the certification office to assess construction work and development together. The routine shares drag the whole project down.
Project risk instead of technical risk
Construction schedule, budget and trade coordination are not technical risks. Anyone arguing this way describes a management problem and gets it decided as such.
The demonstration build is described as a product
The application reads like a building description: floor area, load capacity, construction time. The certification office is looking for the way there, the component tests that did not work and the measurement that proves the difference.
Cost side and facts do not match
The BSFZ certifies the project, the tax office checks the costs. Anyone who claims material costs for the demonstration build, or hours that contradict the project description, loses in the second step, after the certificate has already been issued.
If you already have a rejection, the first step is analysing the decision: which of the five points carries it. That determines whether objection or new application is the right way.
Which other industries use the research allowance?
The sector never decides eligibility — Section 2 FZulG does. These pages show the same three criteria against the activities of each field.
- Mechanical engineering — Design, testing, commissioning
- Automotive — Drivetrain, battery, driving function
- Medical technology — Operating principle, SaMD, pre-approval
- Pharma & life sciences — Compound, formulation, bioprocess
- Energy & cleantech — Cell, storage, grid control
- Aerospace — Structure, propulsion, avionics
- Agriculture & FoodTech — Process, formulation, field trial
- Software & IT — Algorithm, model, architecture
Send us a test report, not a questionnaire
In the first consultation we talk about your component, not about your legal form. After thirty minutes you know which part of your development is eligible, in what order of magnitude, and whether a retroactive application is worthwhile. The first consultation is free; 30 % of the fee falls due with the BSFZ decision, 70 % only after the allowance has been paid out.
Book a first consultationRead on
- The FZulG application in two stepsBSFZ application and tax office application: sequence, deadlines, processing time.
- Calculate the research allowanceEnter personnel costs, R&D share and contract research, read off the amount.
- Which personnel costs countEmployer gross, proportional allocation and what applies to working students and freelancers.
- Time recording for R&D hoursHow an existing time recording is mapped onto projects in a tax-office-proof way.
- Received a BSFZ rejectionRead the decision, determine the reason for rejection, decide between objection and new application.
- Approved projectsAnonymised cases from software, mechanical engineering and medical technology with amounts.
- Mechanical engineering (construction machinery)Where the manufacture of construction machinery overlaps with mechanical engineering R&D.
- Plant engineering for building servicesStorage, heat pumps and grid technology as R&D projects in building technology.
Max Nodes
Founder and Managing Director of NOVARIS Consulting. Specialised in the German R&D tax credit (FZulG) since 2021; 25 of 25 accompanied BSFZ applications approved (as of 09/2026). Max Nodes